Fossil Fuel Plants

fossil1.jpg

Overhead Cranes for Fossil Fuel Plants

The use of overhead cranes within fossil fuel plants can directly affect outages and downtime when the inability to generate electricity in one day could exceed the initial cost of the crane by several times.

When plants are built for a 40 year life or more, it is important that the crane manufacturer can provide warranty, field service, future modifications and replacement parts for years after the initial purchase.

Whiting understands that each power plant is different, and designing cranes for these facilities requires expert planning, engineering, installation and maintenance solutions that are focused on your ever-changing needs. For specific answers to your questions, please contact us at (800) 861-5744. 

See more:

Turbine Room Crane
High load rating (usually 100 to 500 tons), long span (over 1000ft.) and high lift (over 80ft.).

 