Phone Us 888-Whiting   |  Email Us Info@WhitingCorp.com

Trolley Maintenance System
Reducing Polar Crane Downtime

How Will You Replace Your Polar Crane Hoist Motor When It Fails During an Outage?

When downtime can mean hundreds of thousands of dollars during a Refueling Outage, Whiting Nuclear has developed a lift solution to significantly cut that downtime in case of a Polar Crane trolley component failure.

Whiting Nuclear’s Innovative Lifting Solution to Reduce Crane Downtime During an Outage Includes:

  • No modification required to existing structure
  • One ton of lifting capacity over the trolley
  • Lift solution deploys in less than an hour
  • Ability to lift from refuel floor to trolley deck in one pick
  • Configurable to numerous trolley designs
  • A leased solution operated by Whiting Nuclear
trolley Maintenance System