Scrap Handling Overhead Cranes Most Scrap Handling operations require a 20 ton lift capacity, however we have had experience designing solutions between 10 and 60 tons. The primary considerations in specifying a Scrap Handling system are:
1. Tons to be moved
2. Cycle time
3. Distances moved
4. Highest lift required
5. Any below-the-hook devices such as magnets or grapples
Whiting has produced a number of products for Scrap handling applications.
For specific answers to your questions, please contact our Steel Solutions Team with the question box or call 800-861-5744.
|