Scrap Handling Overhead Cranes Most Scrap Handling operations require a 20 ton lift capacity, however we have had experience designing solutions between 10 and 60 tons. The primary considerations in specifying a Scrap Handling system are:
1. Tons to be moved
2. Cycle time
3. Distances moved
4. Highest lift required
5. Any below-the-hook devices such as magnets or grapples
Please fill out the question box to contact our Foundry Solutions Team or call 800-861-5744
|